How we work in regulated sectors
Every sector brings its own standards, and compliance is not a chapter to hand over to somebody else after delivery: it is part of the supply. Equipment, machines and systems arrive already compliant, with the technical file, the calculation report and the declaration.
- CE marking of machines, special equipment and products;
- ATEX, for equipment intended for potentially explosive atmospheres;
- PED, for pressure equipment;
- MIL standards, where the programme requires them;
- structural checks to UNI EN 1090 and the Eurocodes, with the calculation report attached to the technical file.
What we deliver
Requirements change from sector to sector, but these are the recurring supplies:
Which division covers your sector
Frequently asked questions
Do you only handle the design, or do you also deliver the machine?
Both. We can stop at the design and the calculations, or take the system through to acceptance testing and commissioning, with a single person accountable for schedule, cost and communication.
Who takes care of certification?
We do, as part of the supply: technical file, calculation report and declaration of conformity. Depending on how critical the product is, the level of detail in the documentation and the role of the Notified Body change.
Do you handle installation and operator training?
Yes. Installation takes place at your site and includes training for the people who will use the system every day.
Where do we start?
With a technical review of the requirements, even when they are not fully defined yet: we put them in writing, and the preliminary design starts from there. Tell us what you need or call our technical sales department.